Construction Activity – Oct 22 to Oct 26

Locations:

Monday – Wednesday

Broadway: between Shoreline and Magnolia

3rd Street: between Pacific and Shoreline

Thursday – Friday

Broadway: between Pacific and Long Beach Boulevard

3rd Street: between Alamitos and Atlantic

Details:

  • Construction Hours: 7:00 to 3:30
  • Type of Construction Activity: Light Demolition
  • Impacts: From Sully Miller: We are going to start with the direction of travel and keep moving forward. Clearing the AC dike on both streets where the bike lane is. We will close the #1 lane as we work ( If Needed ) and open it at end of the day. There will still be parking on the other side of the street next to the #2 lane on both streets.