Construction Activity – Nov 5 to Nov 9
Locations:
Monday – Friday
3rd Street: Remove and replace sidewalk and C&G on Broadway north side in front of the Hotel Royal.
Sidewalk Construction – Alley aprons, driveway and C&G removal on:
- South side from Elm to Pine
Concrete replacements on –
- South side from Alamitos to Pine
Tree Removal –
- Remove 2 trees at 3rd Street and Daisy
7:30AM to 4:00PM
Broadway: Pacific Ave. to Long Beach Blvd. – North Side of Street
Sidewalk Construction –Alley aprons, driveway and C&G removal on:
- Broadway north side from Atlantic to Alamitos.
Concrete replacements on –
- 3rd Street south side from Alamitos to Pine
7:30AM to 4:00PM
For questions & concerns call the City of Long Beach Public Works hotline (562) 463-4465.