Construction Activity – Nov 5 to Nov 9

Locations:

Monday – Friday

3rd Street: Remove and replace sidewalk and C&G on Broadway north side in front of the Hotel Royal.

Sidewalk Construction – Alley aprons, driveway and C&G removal on:

  • South side from Elm to Pine

Concrete replacements on –

  • South side from Alamitos to Pine

Tree Removal –

  • Remove 2 trees at 3rd Street and Daisy

7:30AM to 4:00PM

Broadway: Pacific Ave. to Long Beach Blvd. – North Side of Street

Sidewalk Construction –Alley aprons, driveway and C&G removal on:

  • Broadway north side from Atlantic to Alamitos.

Concrete replacements on –

  • 3rd Street south side from Alamitos to Pine

7:30AM to 4:00PM

For questions & concerns call the City of Long Beach Public Works hotline (562) 463-4465.