Construction Activity – two week look ahead (no work predicted next week because of rain)

  • Locations & Type of Construction Activity:
    • Traffic control. This traffic control will restrict the entire corridor to one lane only with limited parking due to the bus island construction.
    • Broadway
      • Segment 1 – Shoreline to Pacific:
        • On hold for Grind and overlay.
      • Segment 2 – South Side of street from Pacific to Alamitos:
        • Fill in all missing sidewalk areas
        • Replace Curb Ramps and alley driveways
        • Punchlist work
        • Start Traffic Signal work
    • 3rd Street
      • Segment 1 – Pacific to Golden:
        • On hold for Grind and overlay.
      • Segment 2 – North side of street from Pacific to Alamitos:
        • Fill in all missing sidewalk areas
        • Finish replacement of Curb Ramps and alley driveways
        • Punchlist work
        • Start Traffic Signal work
  • Construction Hours: 7:00 am to 3:30 pm.
  • Impacts:
    • Lane restrictions (sometimes only 1 lane) throughout the length of the project. Parking will be available in the coned areas where construction is not occurring. This will not be advertised.
    • The bike lane is closed on both streets indefinitely.
    • Pedestrian access is 100% and detours are provided (w/ flagman in some cases) where construction activities necessitate a closure of the sidewalk.
    • Temporary Bus stops are in operation.
  • The Contractor is currently trying to pave out the job by end of February.