Construction Activity – two week look ahead (no work predicted next week because of rain)
- Locations & Type of Construction Activity:
- Traffic control. This traffic control will restrict the entire corridor to one lane only with limited parking due to the bus island construction.
- Broadway
- Segment 1 – Shoreline to Pacific:
- On hold for Grind and overlay.
- Segment 2 – South Side of street from Pacific to Alamitos:
- Segment 1 – Shoreline to Pacific:
-
-
-
- Fill in all missing sidewalk areas
- Replace Curb Ramps and alley driveways
- Punchlist work
- Start Traffic Signal work
-
-
-
- 3rd Street
- Segment 1 – Pacific to Golden:
- On hold for Grind and overlay.
- Segment 2 – North side of street from Pacific to Alamitos:
- Fill in all missing sidewalk areas
- Finish replacement of Curb Ramps and alley driveways
- Punchlist work
- Start Traffic Signal work
- Segment 1 – Pacific to Golden:
- 3rd Street
- Construction Hours: 7:00 am to 3:30 pm.
- Impacts:
- Lane restrictions (sometimes only 1 lane) throughout the length of the project. Parking will be available in the coned areas where construction is not occurring. This will not be advertised.
- The bike lane is closed on both streets indefinitely.
- Pedestrian access is 100% and detours are provided (w/ flagman in some cases) where construction activities necessitate a closure of the sidewalk.
- Temporary Bus stops are in operation.
- The Contractor is currently trying to pave out the job by end of February.