Construction Activity – Four Week Look Ahead

  • Locations & Type of Construction Activity:
    • Cat tracking and striping followed by bike lane bollard installation as well as parking meters
    • Traffic control. This traffic control will restrict the entire corridor to one lane only during construction hours but will open up to two lanes during non-construction hours.
    • Work will begin on Broadway near the 710, heading east, & on 3rd Street near Alamitos, heading west.
  • Construction Hours: 7:00 am to 4:00 PM 
  • Impacts:
    • Lane restrictions:
      • Only one lane will be available during construction hours and on 3/4/19
      • Two lines will be available throughout the length of the project during non-construction hours.
      • Parking will be available in the coned areas where construction is not occurring. This will not be advertised. Parking is allowed overnight however, vehicles must clear out by 7:00AM
      • Once parking meters are installed, parking enforcement will resume
    • The bike lane is closed
    • Pedestrian access is 100% and detours are provided (w/ flagman in some cases) where construction activities necessitate a closure of the sidewalk.
    • Temporary Bus stops are in operation.
  • The Contractor is currently trying to complete striping by end of March. (Weather permitting)

To learn more about the project visit DowntownLongBeach.org/construction. For questions and concerns call the City of Long Beach Public Works hotline (562) 463-4465.